Coburg Primary School Senior Campus
Urquhart School Gate
Commission Work 2020
In 2020, Margaret put in a proposal to make another school gate, this time for the Coburg Primary School, Senior Campus on Urquhart Street. The proposal was accepted and the final piece was installed in late June of this year.
![First day of hand plasma-cutting in my workshop.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/652307d5-bcd5-4e5e-a3e8-9d24fdcb3350/First+day+of+hand+plasma-cutting+in+my+workshop.jpeg)
![Chalk drawing onto sheet metal.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/d4c5ef76-2094-4a9e-8856-84d65f59a076/Chalk+drawing+onto+sheet+metal.jpeg)
![Design for Urquhart gate.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/c0e887b7-165f-4bf9-b2e0-040b54af8598/Design+for+Urquhart+gate.jpeg)
![Finished gate rusting.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/fa32e271-03d4-487e-9c40-d796fab1d70b/Finished+gate+rusting.jpeg)
![Installation of gate.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/070a837e-ee9b-4c46-a81e-a969f1b97b92/Installation+of+gate.jpeg)
![Urquhart Gate, Coburg Primary School.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/7fc81d2f-bda1-4b3d-84a9-6f476bf1fa35/Urquhart+Gate%2C+Coburg+Primary+School.jpeg)
![My workshop.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/b0b4013b-fda3-4740-b4b4-ac2951ef2a6c/My+workshop.jpeg)
![Cutting out the tree.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/32d90fc4-7594-4385-9f04-9890dc7fd635/Cutting+out+the+tree.jpeg)
Coburg Primary School
BIKE STAND
Commission Work 2020
In late June of 2020 Margaret was commissioned to create a wall with three metal panels each measuring 4 x 8 feet for the new school bike-stand. This has involved designing the panels depicting children on a skateboard, scooter or bike riding to school. Shortly after getting this job, Melbourne went into lockdown due to the Covid-19 Pandemic. The wall was installed in September, 2021.
Wall panels for Coburg Primary School’s bike stand now installed.
First panel in different stages of production and completion…
![first panel 3.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/a15164b8-0e51-4a50-8f14-3552aeead1c9/first+panel+3.jpeg)
![first panel in.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/9fc66da6-52e2-44b8-83dd-79e10b59fa8c/first+panel+in.jpeg)
![firt panel 2.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/6b91c889-4da0-4680-b1aa-abc3724f9c61/firt+panel+2.jpeg)
Margaret completed the second panel in early October. Here are the latest progress photos…
![Second top panel of gate finished and different stages of the cutting process in the forground.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/b5e6e5e1-29ca-4053-bdde-5b204f2089cc/Second+top+panel+of+gate+finished+and+different+stages+of+the+cutting+process+in+the+forground.jpeg)
![second panel 3.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/dba02f14-59a5-451f-8ccd-12185350813d/second+panel+3.jpeg)
![second panel 2.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/f512930b-1ae4-418c-8dc9-6f02cd1fadae/second+panel+2.jpeg)
Then in late October, the third panel was completed…
![third panel 2.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/04e9ffa0-1709-4fc4-9ce2-863bd22d971d/third+panel+2.jpeg)
![third panel 1.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/2ae929db-d769-4480-b088-98a07fe1f7c1/third+panel+1.jpeg)
![third panel 4.jpeg](https://images.squarespace-cdn.com/content/v1/621ee04cf90b6032dd387097/5244b628-cf36-4c54-b597-32cce7d48233/third+panel+4.jpeg)